Overview
View Current Construction Advisories >
Construction of the Presidio Parkway was planned in two major phases in order to:
- Receive federal stimulus funding and begin construction sooner;
- Achieve seismic safety faster by switching traffic off of Doyle Drive and onto the completed Phase I structures (completed in April 2012);
- And shorten the total length of construction from the original schedule.

View the project phases graphic. (1.0 MB)
On April 30, 2012, seismic safety was achieved on Doyle Drive. Traffic now travels on a temporary bypass comprised of the completed southbound High Viaduct, completed southbound Battery Tunnel, and a temporary bypass. This roadway will carry traffic until the project is complete.