UDBE and Small Business Opportunities

Welcome!

There is a lot of work to be done to build the new Presidio Parkway! This site has been created to provide an interactive forum to inform the small businesses located in San Francisco, the Bay Area and throughout California of contract opportunities within the Doyle Drive Replacement Project, The Presidio Parkway.

Our goal is to provide access to contracting opportunities to as many UDBE, DBE, SBE and DVBEs (what do these stand for?) as possible so that we may meet, or exceed, the participation goals set forth in each of the construction contracts that comprise the Presidio Parkway.

REQUEST FOR QUALIFIED/CERTIFIED UDBE/SBE SUBCONTRACTORS AND SUPPLIERS

Presidio Parkway Project
Caltrans Contract 04-1637U4
San Francisco, CA

We are seeking UDBE/SBE subcontractors to fulfill all or portions of four separate scopes of work coming available in the near future.  The four packages are:  Main Post Substation Construction, Hook Ramp Construction, Hook Ramp Design, Overhead Sign Structure Furnish/Install.


Main Post Substation Construction
Bid Date and Time:  December 20, 2013 @ 9AM
Approximate Construction Start Date:  May of 2014
Scope:  Slab Footings and Trenches, Slabs and Housekeeping Pads, Exterior/Interior Walls, Columns, Elevated Slabs, Roof Slab and Beams, Falsework, Retaining Walls (2ea.)

Hook Ramp Construction
Bid Date and Time:  December 20, 2013 @ 9AM
Approximate Construction Start Date:  April of 2014
Scope:  Retaining Walls (6ea.), Gutter, Abutments, Roadway Slabs, Bridge Soffits, Approach Slabs, Barrier, Temp Paving, Falsework

Hook Ramp Design
Bid Date and Time:  December 20, 2013 @ 9AM
Approximate Design Start Date:  January 2014
Scope:  Retaining Walls (6ea.), Gutter, Abutments, Roadway Slabs, Bridge Soffits, Approach Slabs, Barrier, Temp Paving, Falsework

Overhead Sign Structure Furnish/Install
Bid Date and Time:  January 3, 2013 @ 2PM
Approximate Construction Start Date:  June of 2015
Scope:  Furnish AND/OR install overhead sign structures.

Please contact Dan Lewis to receive full bid package(s).
Partial Scopes are welcome.  Each bid package is broken into Final Pay Items.  Bidder may elect to bid entire package or just portions of it.

Performance and payment bonds by admitted surety, naming prime contractor as the obligee, in full amount of the subcontractor’s bid, subject to approval by Flatiron/Kiewit required. Bonding assistance is available. This project is an OCIP administered project and subcontractors will comply with OCIP eligibility and policy requirements.

Dan Lewis
Flatiron/Kiewit, a joint venture
1051 Edie Road
San Francisco, CA 94129
Phone (916) 919-3829
dalewis@flatironcorp.com

Presidio Parkway Project
Caltrans Contract 04-1637U4
San Francisco, CA

We are seeking UDBE/SBE subcontractors to fulfill all or portions of four separate scopes of work coming available in the near future.  The four packages are:  Main Post Substation Construction, Hook Ramp Construction, Hook Ramp Design, Overhead Sign Structure Furnish/Install.

Main Post Substation Construction
Bid Date and Time:  December 20, 2013 @ 9AM
Approximate Construction Start Date:  May of 2014
Scope:  Slab Footings and Trenches, Slabs and Housekeeping Pads, Exterior/Interior Walls, Columns, Elevated Slabs, Roof Slab and Beams, Falsework, Retaining Walls (2ea.)

Hook Ramp Construction
Bid Date and Time:  December 20, 2013 @ 9AM
Approximate Construction Start Date:  April of 2014
Scope:  Retaining Walls (6ea.), Gutter, Abutments, Roadway Slabs, Bridge Soffits, Approach Slabs, Barrier, Temp Paving, Falsework

Hook Ramp Design
Bid Date and Time:  December 20, 2013 @ 9AM
Approximate Design Start Date:  January 2014
Scope:  Retaining Walls (6ea.), Gutter, Abutments, Roadway Slabs, Bridge Soffits, Approach Slabs, Barrier, Temp Paving, Falsework

Overhead Sign Structure Furnish/Install
Bid Date and Time:  January 3, 2013 @ 2PM
Approximate Construction Start Date:  June of 2015
Scope:  Furnish AND/OR install overhead sign structures.

Please contact Dan Lewis to receive full bid package(s).
Partial Scopes are welcome.  Each bid package is broken into Final Pay Items.  Bidder may elect to bid entire package or just portions of it.

Performance and payment bonds by admitted surety, naming prime contractor as the obligee, in full amount of the subcontractor’s bid, subject to approval by Flatiron/Kiewit required. Bonding assistance is available. This project is an OCIP administered project and subcontractors will comply with OCIP eligibility and policy requirements.

Dan Lewis
Flatiron/Kiewit, a joint venture
1051 Edie Road
San Francisco, CA 94129
Phone (916) 919-3829
dalewis@flatironcorp.com

 

 
  © Copyright Presidio Parkway Contact Us  |  Press Center  |  Site Map  |  Neighborhood UpdatesAgency Logos