<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet href="rss.xsl" type="text/xsl"?>
<rss version="2.0"><channel><title>Presidio Parkway Project Neighbors</title><link>http://www.presidioparkway.org/neighbors/</link><description></description><ttl>5</ttl><item><title>Night and Weekend Work – Hwy 1 Lane Closures</title><link>http://www.presidioparkway.org/neighbors/#night_and_weekend_work__hwy_1_lane_</link><description><![CDATA[There will be night and early morning work on and around the Ruckman Bridge due to required lane closures to grind, pave, stripe and realign portions of Highway 1 as part of the Highway 1/101 interchange improvements.<br/><br/><ul><li>Work is planned for <strong>8 pm to 7 am</strong> on the following days: <ul><li>Thursday, February 2</li><li>Friday, February 3</li><li>Sunday, February 5</li><li>Monday, February 6</li></ul></li><li>On <strong>Saturday, February 4 and Sunday, February 5 from 5:00 am to 2:00 pm</strong> paving and striping will occur on northbound Highway 1.</li></ul>In addition, a eucalyptus tree will be removed between the lower Storey residences and southbound Highway 1 on <strong>Thursday, February 2 during normal working hours</strong>. Removal of this tree will facilitate replacement of the lower Rod Road residential parking area.]]></description><pubDate>Wed, 01 Feb 2012 16:16:00 PST</pubDate></item><item><title>Lincoln Boulevard &amp; Storey Avenue Closure and Night Work</title><link>http://www.presidioparkway.org/neighbors/#lincoln_boulevard__storey_avenue_closure_and_night_</link><description><![CDATA[<strong>The closure of Lincoln Boulevard and Storey Avenue has been extended</strong> and is expected to continue through the week of January 9 and potentially into the week of January 16. This closure is necessary to restore sidewalks and roadway elements in the area.<br/><br/><strong>The lower portion of Storey Avenue is expected to remain closed approximately one week after Lincoln Boulevard re-opens.</strong> The website will be updated when the dates for these closures are confirmed.<br/><br/>Additionally, there is expected to be night work on <strong>Friday, January 20 and Saturday, January 21 from 7:00 p.m. to 10:00 a.m. the next morning.</strong> This night work is associated with closures of northbound and southbound Highway 1 at Highway 101 in order to shift the traffic alignment. An advisory will be sent with more information when the closure dates and times are confirmed.&nbsp;]]></description><pubDate>Mon, 09 Jan 2012 15:47:00 PST</pubDate></item><item><title>Night Work along Southbound Highway 101 and Highway 1, January 3-5</title><link>http://www.presidioparkway.org/neighbors/#night_work_along_southbound_highway_101_and_highway_</link><description><![CDATA[As a reminder, there will be night work on <strong>Tuesday &ndash; Thursday, January 3-5, from 9:00 p.m. to 5:00 a.m. the next morning</strong> along southbound Highway 101 and Highway 1 to move temporary barrier railings (k-rail) and install light poles and signs.<br/><br/>This work must be conducted at night as it will require lane closures on Highway 1 and Highway 101.<br/><br/>The dates for this work could change depending on weather and unforeseen conditions.]]></description><pubDate>Tue, 03 Jan 2012 12:21:00 PST</pubDate></item><item><title>Night Work for Ramp Closure and Alignment</title><link>http://www.presidioparkway.org/neighbors/#night_work_for_ramp_closure_and_alignment_</link><description><![CDATA[On <strong>Tuesday, December 27 and Tuesday-Thursday,&nbsp;January 3-5</strong>, there will be work from <strong>9 p.m. to 5 a.m. the next morning</strong> along southbound Highway 101 and southbound Highway 1 to work on the alignment of the off-ramp, remove temporary barrier railings (k-rail) and install crash cushions.<br/><br/>As part of this work, the ramp from southbound Highway 101 to southbound Hwy 1 will be closed on Wednesday, December 28 from 12:30 a.m. to 4:00 a.m.<br/><br/>The dates for this work could change depending on weather and unforeseen conditions.<br/><br/>There will be additional closures of Highway 1 in January as crews work to finalize the Highway 101/1 interchange. Advisories will be sent as dates and times are determined.]]></description><pubDate>Thu, 22 Dec 2011 13:35:00 PST</pubDate></item><item><title>Sunday Work for Light Pole Foundations, December 4</title><link>http://www.presidioparkway.org/neighbors/#sunday_work_for_light_pole_foundations_december_4_</link><description><![CDATA[On <strong>Sunday, December 4 there will be work from 9 a.m. to 6 p.m. </strong>along southbound Highway 101 to southbound Highway 1 to install foundations for light poles.<br/><br/>Work will include pouring concrete, the use of heavy machinery and back-up beepers.<br/><br/><a href="http://www.presidioparkway.org/project_docs/files/neighborhoodletter_sundaywork_december4.pdf" target="_blank">View&nbsp;the neighborhood letter for a map of the work area.</a>]]></description><pubDate>Fri, 02 Dec 2011 14:07:00 PST</pubDate></item><item><title>UPDATE: Night Work for Toll Plaza Intersection Improvements</title><link>http://www.presidioparkway.org/neighbors/#update_night_work_for_toll_plaza_intersection_improvements_</link><description><![CDATA[There is <strong>no night work scheduled for November 28 &amp; 29</strong> in association with the Golden Gate Bridge Southeast Visitor Plaza/Lincoln Boulevard/Merchant Road intersection improvement project.<br/><br/><strong>There will be night work on Wednesday, November 30</strong> for a concrete pour. There will be a closure of the last S.F. exit on Highway 101 in conjunction with this work.<br/><br/>We will update this page as future night work is scheduled.]]></description><pubDate>Mon, 28 Nov 2011 10:19:00 PST</pubDate></item><item><title>Night Work Along Highway 101, November 18</title><link>http://www.presidioparkway.org/neighbors/#night_work_along_highway_101_november_18_</link><description><![CDATA[On <strong>Friday, November 18</strong>, there will be night work from <strong>10 p.m. to 8 a.m.</strong> to shift the traffic alignment along the ramp from southbound Highway 101 to southbound Highway 1. Work will include minor paving, moving temporary barrier railing, and striping.<br/><br/>This work will require the closure of the off-ramp from southbound Highway 101 to southbound Highway 1.<br/><br/>This work and closure are weather dependent and could be rescheduled due to rain. The alternate date for the work is Saturday, November 19.]]></description><pubDate>Wed, 16 Nov 2011 12:38:00 PST</pubDate></item><item><title>Night Work for Toll Plaza Intersection Improvements</title><link>http://www.presidioparkway.org/neighbors/#night_work_for_toll_plaza_intersection_improvements_</link><description><![CDATA[Due to traffic and safety concerns, the work to improve the northbound toll plaza off-ramp and the southeast Visitor Plaza/Lincoln Boulevard/Merchant Road intersection <strong>must occur at night.</strong><br/><br/>The project will be implemented for approximately three weeks (weather permitting), beginning Wednesday, November 16. Work hours are 7 pm to 5 am each work night. There will be a detour in place, except during ramp closures referenced below. <a href="http://www.presidioparkway.org/project_docs/files/nightwork_nov15_2011.pdf" target="_blank">Please see the&nbsp;neighborhood letter&nbsp;for the detour route</a>. Work will not occur over Thanksgiving weekend.<br/><br/>We apologize for the disruption associated with this work.]]></description><pubDate>Wed, 16 Nov 2011 11:41:00 PST</pubDate></item><item><title>Night Work for Intersection Improvements, November 16 &amp; 17</title><link>http://www.presidioparkway.org/neighbors/#night_work_for_intersection_improvements_november_16__</link><description><![CDATA[Beginning <strong>Wednesday, November 16, for approximately three weeks</strong> there will be work at the Golden Gate Bridge Southeast Visitor Plaza/Lincoln Boulevard/Merchant Road intersection in order to improve traffic flow in the area. The majority of this work will occur between 7 a.m. and 7 p.m., however, there will be several nights of work associated with this project.<br/><br/>On <strong>Wednesday, November 16, and Thursday, November 17</strong>, work will occur from <strong>10 p.m. to 5 a.m.</strong> to remove existing curbs, set barrier railing and demolish the existing median. This work will include saw-cutting, backfilling and the use of heavy machinery. During this time, the last exit on northbound Hwy 101 just before the Toll Plaza will be closed. <a href="http://presidioparkway.org/project_docs/files/merchantrampclosure_nov2011.pdf" target="_blank">See the advisory for a map with detour routes.</a><br/><br/><strong>*Important changes to circulation*</strong> During this closure, there will be no access to Lincoln Boulevard from northbound Highway 101.]]></description><pubDate>Fri, 11 Nov 2011 13:27:00 PST</pubDate></item><item><title>Night Work Adjacent to Southbound Hwy 101 for Utility Installation </title><link>http://www.presidioparkway.org/neighbors/#night_work_adjacent_to_southbound_hwy_101_for_</link><description><![CDATA[The night work previously scheduled for October 14 through October 31 was rescheduled to begin on <strong>Monday, November 14. This work is expected to last approximately one week </strong>and may continue through November 23 depending on weather.<br/><br/>The work will occur between the Log Cabin and the Toll Plaza and will include the use of heavy machinery to backfill the utility trench and restore the slope along the highway.<br/><br/>Work hours are 10 p.m. to 5 a.m.<br/><br/>This work will be conducted from the highway and must occur at night as it requires the closure of a lane on southbound Highway 101.]]></description><pubDate>Wed, 09 Nov 2011 14:26:00 PST</pubDate></item></channel></rss>

