Video Library << back

Please download the Flash player to view video.
 
Video Image
Rare Manzanita Relocation - Narrated
February 24, 2010
Learn more about the rare Franciscan Manzanita found in the project area and the process to relocate it from David Yam, Caltrans landscape architect.
Share This Video  |  View in Silverlight  |  View in WM Player
Watch Video Rare Manzanita Relocation - Narrated
Video Image 07:16 | Play | February 24, 2010
Learn more about the rare Franciscan Manzanita found in the project area and the process to relocate it from David Yam, Caltrans landscape architect.
Watch Video Long-Term Ramp Closures and Initial Construction Activity
Video Image 01:00 | Play | February 10, 2010
Watch Video Rare Manzanita Relocation
Video Image 02:41 | Play | January 27, 2010
Manzanita gets new home away from construction area. Watch a video of its move.
Watch Video 3D/4D Modeling Tool
Video Image 01:00 | Play | January 26, 2010
3D/4D modeling tool demonstrating construction of the Southbound Battery Tunnel and Temporary Bypass (Contract 4)
Watch Video Utility Relocation Activity
Video Image 01:00 | Play | January 22, 2010
Late 2009-Early 2010

Watch workers near Crissy Field saw-cut and trench to relocate utilities in preparation for construction of the Presidio Parkway.
Watch Video In Their Own Words - Basil Falcone
Video Image 02:15 | Play | December 3, 2009
Learn what it took for Basil Falcone, a small business owner, to be awarded a contract to work on the Doyle Drive project.
Watch Video 3D4D Modeling Tool
Video Image 01:00 | Play | November 20, 2009
3D4D model showing Contract 3 Construction including the southbound high viaduct, southern Park Presidio interchange and Ruckman Structure.
Watch Video Presidio Parkway
Video Image 02:19 | Play | November 5, 2009
This simulation shows the Presidio Parkway, post-construction, which is expected to be completed in 2014.

View information about the Presidio Parkway's key features.
Watch Video Presidio Parkway - Project Overview
Video Image 02:54 | Play | November 5, 2009
This simulation shows an overview of the Presidio Parkway project.
Watch Video General Traffic Patterns During Construction
Video Image 01:35 | Play | November 4, 2009
Watch Video New Access to the Presidio and the Marina-Narrated
Video Image 01:06 | Play | September 3, 2009
Simulation showing new access to the Presidio and the Marina upon project completion. Video video narrated by José Luis Moscovich, Executive Director, San Francisco County Transportation Authority.
Watch Video New Access to the Presidio and the Marina
Video Image 01:00 | Play | September 2, 2009
Watch Video Why Must Doyle Drive Be Replaced?
Video Image 00:57 | Play | July 15, 2009
Doyle Drive is structurally and seismically deficient. Watch and learn why it must be replaced.
Watch Video Doyle Drive Replacement Project-Narrated
Video Image 02:17 | Play | January 7, 2009
Overview simulation video narrated by José Luis Moscovich, Executive Director, San Francisco County Transportation Authority.
Watch Video Doyle Drive Replacement Project
Video Image 02:06 | Play | January 6, 2009
This simulation shows the Doyle Drive Presidio Parkway, post-construction, which is expected to be completed in 2014.